NEWS - BMT SeaTech studies re-design of Portsmouth Harbour channel  
                 
  defence news careers   services:

Defence companies

BMT Cordah Ltd
BMT Defence Services Ltd
BMT Defence Services (Australia) Pty. Ltd
BMT Designers & Planners Inc
BMT Fleet Technology Ltd
BMT Fluid Mechanics Ltd
BMT Isis Ltd
BMT Marine Projects Ltd
BMT Nigel Gee Ltd
BMT Reliability Consultants Ltd
BMT SeaTech Ltd
BMT Sigma Ltd
BMT Syntek Technologies Inc

BMT SeaTech studies re-design of Portsmouth Harbour channel

BMT SeaTech Ltd has recently completed a comprehensive study for Defence Estates South West. Forming part of the Portsmouth Harbour Regeneration Project, the study looks at the re-design of the deep water channel for Portsmouth Harbour in the light of its use by large future warships for the Royal Navy. When a large ship enters a port or harbour, it frequently has to do so along a comparatively shallow and often winding approach channel. BMT has extensive experience of approach channel design and was commissioned by Defence Estates to review the suitability of the present channel for large warships proposed for the future. In addition, an alternative "straight in" channel design, remote from the present channel, was to be reviewed.

At Portsmouth, channel design is constrained by a number of elements. One is the historic harbour entrance, bounded on both sides by structures dating back to Henry VIII which understandably must not be touched. Similarly, the Spit Sand Fort must be avoided, as should other sites of historical interest such as that occupied by the remains of the Mary Rose.

From a navigational point of view, the present approach to the harbour entrance involves a number of course changes in, or near, the entrance which puts a large ship at risk. Therefore, the elimination of these changes was seen as an important part of any new channel design.

Portsmouth, however, possesses a significant natural advantage. There is a natural channel, underlying the present approach channel, which has been formed as the tide moves water in and out of the harbour. By making use of this channel, BMT, using its PCSS fast time manoeuvring simulation model, was able to produce a design which both eliminated the awkward course changes at the harbour entrance and made the fullest use of the available, natural, deep water. This so-called "Blue 2" channel led to significantly reduced dredging costs compared with the alternative "straight in" channel and avoided both the Spit Sand Fort and the Mary Rose site.

Dr Ian Dand of BMT Seatech Ltd, who is responsible for the design study, said: "Using sophisticated computer simulation, we have been able to show that the existing, natural, channel, with some dredging, can be used for the large warships proposed for the future. This will minimise environmental disruption as well as reducing marine risk."

Latest news

29/09/08 - BMT Focus 2008, Issue 2 (Requires Acrobat Reader)

18/07/08 - New High-Speed Pentamaran Yacht from BMT Nigel Gee

09/07/08 - Jim Davis appointed as New President of BMT Syntek Technologies Inc.

12/06/08 - BMT completes RFA Argus study

More news...

Contracting with FATS

You can contract with BMT via FATS.

New to the MoD's Framework Agreement for Technical Support? Read our online User Guide (or see the RLI).

Looking for a specific capability? Search our BMT FATS/2 Market Knowledge Matrix

Contacts

Richard Danns
Business Development Manager

Tel:
+44 (0)1225 473672

Fax:
+44 (0)1225 448714

E-mail:
enquiries@bmt-defence.com

  A part of BMT in Defence